Fort Buchanan Projects
Ft. Buchanan Water Piping Ph II
Ft Buchanan Building 21 Repairs
Ft Buchanan AC Water Piping Ph III – Construction:
- New Water Piping Distribution, about 23,000 LnFt
- New Water Piping Runs to buildings, about 10,000 LnFt
- About 70 Domestic and Fire Water piping connections for Buildings through-out military base facility
- Erosion Control Measures, Maintenance of Traffic
- Piping-related civil work, Asphalt Paving repairs
Ft Buchanan Building 399 Repairs – Construction:
- Lead Paint Abatement, Asbestos (ACM) Abatement
- Demo – Ceilings, HVAC, Plumbing, Electrical, Doors, Gypsum
- New Gypsum Partitions, Gypsum Repairs
- New Acoustical & Gypsum Ceilings
- Paint (Interior and Exterior)
- New Doors and Hardware (Interior and Exterior Perimeter)
- Misc. Metals Repairs, New ABA / ADA Concrete Ramp
- New HVAC System
- New Electrical Work and Electrical Repairs (Lighting, Power, HVAC Power)
- Tel-Data, Fire Signaling and Fire Station Antenna Communications, Security Alarm
- Approximately 16,500 Sq. Ft.
Ft Buchanan Las Colinas Residential Repair
Ft Buchanan Bldg 31 Pump House