Category
Institutional
GSA Center CBP Labs
Pre-Construction Phase:
- Existing Building Survey
- Architectural, MEP Design
- Environmental / Emissions Permit
Construction Phase:
- ACM and LBP Environmental Abatement
- Ceilings, HVAC, Plumbing, Electrical, Doors & Hardware, Gypsum
- New Gypsum Partitions, Gypsum Repairs, Vault Structural Walls
- Interior Paint, New Flooring, and ACT
- New Laboratories Plumbing (Special Drainage and Neutralization Tank, Special Gas Piping, Domestic Water Cistern, Solar Water Heater)
- Sprinklers (Fire Protection) and HVAC System, Precision Cooling Units
- New Electrical Work and Electrical Repairs (Lighting, Power, HVAC Power), Off-Site Electrical Work
- Tel-Data, Fire Signaling, Security Alarm, Access Control, CCTV