Category
Institutional

GSA Center CBP Labs

 

Pre-Construction Phase:

  • Existing Building Survey
  • Architectural, MEP Design
  • Environmental / Emissions Permit

 

Construction Phase:

  • ACM and LBP Environmental Abatement
  • Ceilings, HVAC, Plumbing, Electrical, Doors & Hardware, Gypsum
  • New Gypsum Partitions, Gypsum Repairs, Vault Structural Walls
  • Interior Paint, New Flooring, and ACT
  • New Laboratories Plumbing (Special Drainage and Neutralization Tank, Special Gas Piping, Domestic Water Cistern, Solar Water Heater)
  • Sprinklers (Fire Protection) and HVAC System, Precision Cooling Units
  • New Electrical Work and Electrical Repairs (Lighting, Power, HVAC Power), Off-Site Electrical Work
  • Tel-Data, Fire Signaling, Security Alarm, Access Control, CCTV