Send Relief
Electrical System works that included:
Site Work
- Primary Power Feeder, Primary Switch, PMT 300 KVA
- Generator Set 350KW, ATS-1200A, Sub-Base Tank for 48-Hrs, concrete base
- Secondary Distribution from PMT to buildings
- Site lighting distribution with pole bases, poles-luminaires
- Telecom Service empty conduits distribution
- Concrete bases and grounding
Buildings Electrical Work:
- Electrical Demo for Building A
- Lighting Distribution
- Power Distribution
- Tel-Comm systems
- Lighting Fixtures, Wiring Devices
- Power Wiring Devices and Disconnect Switches
- Fire Signaling System for Buildings